Check diagonals, corners, and wall bows before you dream up cabinet runs. A room that’s out by even a degree can shove an island off-center and steal precious reveal. Measure corner-to-corner, map humps and hollows, and plan subtle fillers that blend gracefully so the eye sees harmony, not compromise.
Find the floor’s highest point, then set a continuous laser reference for counter height. Plan a shimming strategy before the first cabinet moves. Consistent baselines keep doors aligned, end panels vertical, and countertops flat, preventing drawer rub and appliance rattle. Precision here makes the entire room feel calm and intentional.
Ceilings lie and soffits wander. Measure multiple points along each wall-to-ceiling junction, noting dips and rakes that could trap crown molding. Budget scribe allowances on tall panels and plan crown heights that mask small variations. The goal is elegant continuity, not forced perfection where the structure refuses to cooperate.
Dimension from consistent datums, call out centerlines, and label finished-surface references. Attach photos with measurements visible to prove intent. Translate site reality into shop drawings that vendors understand instantly. This bridge prevents friendly assumptions from becoming expensive remakes and keeps your schedule protected from needless rework.
Pre-cut shims, ledger rails, and screw maps make installation surgical. Identify low spots and bowed walls in advance, then assign shim locations cabinet by cabinet. A measured plan lets the team work confidently, protecting plumb lines and ensuring reveals remain crisp even when structure tests their patience.
Cross-check appliance spec books, plumbing rough-ins, and final cabinet dimensions in one sitting. Verify hinge swing space against adjacent handles. Confirm countertop overhangs and backsplash thickness. A single, slow review backed by clear measurements saves weeks and prevents the kind of cascade that turns small errors into major delays.
All Rights Reserved.